From Shafa’atu Suleiman, Sokoto
The Deputy Minority Leader of the House of Representatives, Abdussamad Dasuki, has facilitated the installation of solar power systems in two general hospitals in Sokoto State to improve healthcare delivery and ensure reliable electricity supply for critical medical services.
The benefiting facilities are Dogondaji and Tambuwal General Hospitals, where the installations are expected to provide uninterrupted electricity to critical units, including accident and emergency sections, labour rooms, operating theatres, laboratories and selected wards.
Dasuki, who represents Kebbe/Tambuwal Federal Constituency, disclosed this while addressing journalists in Tambuwal on Friday through his Senior Legislative Aide, Attahiru Danmadi.
He said each hospital had been equipped with three Felicity lithium batteries with a combined storage capacity of 52.5 kilowatt-hours, two 12-kilovolt-ampere inverters and 45 bifacial solar panels, each rated at 620 watts.
According to him, the projects were facilitated in collaboration with the Energy Commission of Nigeria, Abuja, to address electricity challenges in the health facilities and strengthen the delivery of essential medical services.
“With these installations, the hospitals are expected to no longer rely on generators during surgical operations, as the solar systems will provide electricity to the theatres and other critical units,” he said.
The lawmaker said that the intervention was designed to benefit the hospitals and surrounding communities, irrespective of political affiliation.
He, however, disclosed that the planned formal handover ceremony could not take place because the project team was denied access to the facilities.
Dasuki said the development compelled him to address journalists and place the installations in the care of the respective hospital authorities for the benefit of the communities.
He urged the hospital authorities to protect the facilities, ensure their proper utilisation and maintenance, and promptly report any operational challenges to the relevant technical personnel.
He appreciated the Energy Commission of Nigeria, project teams and other stakeholders for their contributions towards the successful completion of the projects.

Follow Us on Google
